Main Loading Summary & Particulars

Upload or link your Main sheet screenshot and technical paragraph here.

Tank Soundings, Ballast Control & Free Surface Calculation (Main Module)

Stability Monitor - Trimming, Water Ballast Side, and Heavy Fuel Oil Tanks (Tank 01)
Figure 2.1: Trimming Tanks, Water Ballast Side Tanks, and Heavy Fuel Oil Tanks — Tank 01
Stability Monitor - Marine Diesel Oil, Lubricating Oil, and Auxiliary Oil Tanks (Tank 02)
Figure 2.2: Marine Diesel Oil, Lubricating Oil, and Other Oil Tanks — Tank 02

Real-time tank monitoring across trimming tanks (fore/aft peak), water ballast side tanks (port and starboard), heavy fuel oil service and storage tanks, marine diesel oil tanks, lubricating oil tanks, and auxiliary oil tanks. Entering a tank's sounding automatically updates visual fill-level indicators (blue for center and trimming, red for port, green for starboard) and computes exact weight, volume, 3-axis centers of gravity (LCG, VCG, TCG), transverse moment of inertia (TMI), and free surface effect losses.

Live hydrostatic and strength header continuously tracks displacement, forward/aft/mean drafts, trim, list, corrected GM (with free surface loss), still-water shear force, and bending moment in real time.

Port/starboard balance sub-totals: dedicated port and starboard totals give instant visibility into transverse heeling moments and ballast symmetry during cargo operations.

Container Bay-Plan Distribution & Cargo Loading (Bay 15 Summary)

Stability Monitor - Container Bay-Plan Distribution Summary Bay 15
Figure 3.1: Container Bay-Plan View (On Deck and Under Deck Tiers) — Summary Bay 15

The cargo module provides a dedicated bay-plan view for every container bay onboard, separating on-deck and under-deck tiers by standard ISO bay–row–tier coordinates. Each cell is mapped to its exact longitudinal, transverse, and vertical coordinates, enabling the software to automatically compute the individual stability, trim, heel, and structural impact of every loaded container and aggregate the total cargo effect across the entire vessel.

Port-of-destination sheet architecture: each port of call (P1, P2, etc.) is managed on its own dedicated worksheet containing complete port-specific loading details, allowing instant tracking of load/discharge sequences across multi-port voyages.

Built-in input protection and error prevention: during data entry, user access is restricted strictly to valid container slot cells with enforced weight-range validation—preventing accidental formula overwrites, random data entries, and human input errors.

Real-time live feedback header: a pinned top status bar continuously displays live forward/aft draft, metacentric height, free surface losses, and list angle as containers are added or shifted.

Scalable for any vessel and voyage: supports a wide range of container bays and ports of call, adapting seamlessly to your vessel's TEU/FEU capacity and route schedule.

Section GZ — Case 01 (Initial Stability Monitor)

Stability Monitor - Statical and Dynamical Stability Curve (GZ 01)
Figure 1.1: Statical and Dynamical Stability Curves — GZ 01
Stability Monitor - Statical and Dynamical Stability Curve (GZ 03)
Figure 1.2: Statical and Dynamical Stability Curves — GZ 03

Once cargo hold or bay loading and tank soundings are completed, the GZ curve automatically updates to the final loading condition, displaying righting arm values across different angles of heel to verify compliance with IMO Intact Stability requirements for safe passage. The curve extracts two values for initial metacentric height (GM): the directly calculated GM displayed at the top of the curve, and the graphical GM given by the intersection of the curve tangent at zero degrees with the perpendicular line at one radian (57.3 degrees) on the vertical GZ scale. Both GM values should match closely, allowing only a minor tolerance due to tangent drawing accuracy. The maximum GZ value extracted from the curve demonstrates the vessel's righting power to return to the upright position from any angle of heel; higher maximum GZ values indicate a stiff ship, whereas smaller values indicate a tender ship. When initial GM is negative, GZ becomes negative at small heel angles until the vessel settles at an equilibrium heel known as the angle of loll (where GZ crosses back to positive). By contrast, when GZ turns negative at a large angle of heel after positive stability, that crossing point is the angle of vanishing stability, beyond which the vessel will not return to the upright position. Finally, the accumulated area under the GZ curve is calculated using Simpson's rules to verify IMO stability requirements for the current loading condition and tank soundings, noting that the zero baseline of the accumulated area curve is distinct from the zero baseline of the GZ curve.

Section GZ — Case 02 (Transverse Intact Stability Monitor)

Stability Monitor - Statical and Dynamical Stability Curve (GZ 02)
Figure 1.3: Statical and Dynamical Stability Curves — GZ 02
Stability Monitor - Statical and Dynamical Stability Curve (GZ 04)
Figure 1.4: Statical and Dynamical Stability Curves — GZ 04

The stability monitor evaluates the vessel’s transverse intact stability across angles of heel from 0° to 60° at a displacement of 58,924.54 tonnes and an initial metacentric height (GM) of 0.96 m. Starting from upright equilibrium at 0°, the statical stability curve (righting moment) ascends steadily through the initial angles of heel, reflecting positive initial stability. It reaches its peak righting moment of approximately 55,500 t·m at a 35° angle of heel while maintaining a broad plateau exceeding 49,000 t·m between 30° and 45°. Beyond 45°, the righting arm diminishes rapidly due to deck-edge immersion and loss of waterplane inertia, crossing below the baseline just prior to 60° to establish an angle of vanishing stability at approximately 59.5°. Simultaneously, the dynamical stability curve, plotted against the secondary vertical axis to represent the cumulative work required to heel the vessel, follows a parabolic rise at small angles before climbing steeply through the peak righting moment zone and leveling off near 32,000 t·m·rad at 60°. Together, these curves confirm a wide range of positive stability and substantial reserve dynamical energy well beyond the 30° benchmark required under standard IMO intact stability criteria.

Longitudinal Hull Strength — Shear Force & Bending Moment

Stability Monitor - Longitudinal Hull Strength (St 01)
Figure 4.1: Longitudinal Hull Strength & Stress Distribution — St 01
Stability Monitor - Longitudinal Hull Strength (St 02)
Figure 4.2: Still-Water Shear Force & Bending Moment Curves — St 02
Stability Monitor - Longitudinal Hull Strength (St 03)
Figure 4.3: Frame-by-Frame Stress Verification & Permissible Limits — St 03

Longitudinal hull strength evaluation across hull stations and frame intervals, computing Still-Water Shear Forces (SWSF) and Still-Water Bending Moments (SWBM) against classification society sea-going and harbor permissible limits.

Hydrostatic Curves & Particulars

Ready for your Hydrostatic sheet screenshot and technical paragraph.

Frame-by-Frame Weight & Buoyancy Distribution

Ready for your Frames sheet screenshot and technical paragraph.

Draft & Trim Corrections

Ready for your Corrections sheet screenshot and technical paragraph.

Partial Loading & Auxiliary Particulars

Ready for your Part sheet screenshot and technical paragraph.